Moisture Considerations: Bamboo flooring must be installed in a dry location. Your installer
may want to perform a calcium chloride moisture test before installation. If the calcium chloride
moisture test result is less than or equal to 3 lbs then the concrete floor is considered dry.
Test results above 3 lbs would require a moisture barrier. Basement and below grade installations
are not recommended.
Floor Condition: Concrete sub floor must be smooth and level. If this is not the case, steps
must be taken to remedy the situation. Any dips or low spots should be filled with an appropriate
material. Consider Bostik Floor Patch #101 when rehabilitating concrete floors.
Glue-down: Use an adhesive designed to glue wood flooring to concrete and follow instructions
provided with the adhesive. Consider Franklin 811 Plus
(www.franklinflooring.com) or Bostik's Best
(www.bostikfindley-us.com) when choosing an adhesive.
Floating Floors: The floating floor method can be used for concrete sub floor installations.
A vapor barrier should be considered. Consider using Bruce Everseal Adhesive and carefully follow
the instructions provided with the adhesive. Floating 3/8" thick flooring is not recommended.
|